Bryant 140 Instrucciones de operaciones

Busca en linea o descarga Instrucciones de operaciones para Bombas de calor Bryant 140. Bryant 140 Operating instructions Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 60
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
-- 1 --
340AAV
4--WAY MULTIPOISE FIXED--CAPACITY
CONDENSING GAS FURNACE
Installation, Start--up and
Operating Instructions
for Sizes 040--140, Series B & C
Visit www.Bryant.com
NOTE: Read the entire instruction manual before starting
the installation.
NOTE: This furnace can be installed as a
(2-pipe) direct vent
or (1-pipe) non-direct vent
condensing gas furnace.
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA
B149 code. Vent systems must be composed of pipe, fittings,
cements, and primers listed to ULC S636. The special vent
fittings and accessory concentric vent termination kits and
accessory external drain trap have been certified to ULC S636 for
use with those IPEX PVC vent components which have been
certified to this standard. In Canada, the primer and cement must
be of the same manufacturer as the vent system -- IPEX System
636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and
IPEX System 636
(1)
t, PVC Cement for Flue Gas Venting, rated
Class IIA, 65 deg C. must be used with this venting system -- do
not mix primers and cements from one manufacturer with a vent
system from a different manufacturer. Follow the manufacturers
instructions in the use of primer and cement and never use primer
or cement beyond its expiration date.
The safe operation, as defined by ULC S636, of the vent system
is based on following these installation instructions, the vent
system manufacturers installation instructions, and proper use of
primer and cement. All fire stop and roof flashing used with this
system must be UL listed material. Acceptability under Canadian
standard CSA B149 is dependent upon full compliance with all
installation instructions. Under this standard, it is recommended
that the vent system be checked once a year by qualified service
personnel.
The authority having jurisdiction (gas inspection authority,
municipal building department, fire department, etc) should be
consulted before installation to determine the need to obtain a
permit.
D
E
S
I
G
N
C
E
R
T
I
F
I
E
D
CERTIFIED
Always Ask For
Use of the AHRI Certified TM Mark indicates a
manufacturers participation in the program. For
verification of certification for individual products,
go to www.ahridirectory.org.
Consignes spéciales pour l’installation de ventillation au Canada
L’installation faite au Canada doit se conformer aux exigences du
code CSA B149. Ce systême de ventillation doit se composer de
tuyaux, raccords, ciments et apprêts conformes au ULC S636. La
tuyauterie de ventillation des gaz, ses accessoires, le terminal
concentrique mural ainsi que l’ensemble du drain de condensat
extérieur ont été certifiés ULCS 636 pour l’application des
composantes IPEX PVC qui sont certifiées à ce standard. Au
Canada l’apprêt et le ciment doivent être du même manufacturier
que le systême de ventillation -- IPEX Système 636, Apprêt
PVC/CPVC. Mauve Violette pour conduit en évacuation des gaz
et IPEX Système 636
(1)
t, ciment pour PVC pour conduit en
évacuation des gaz, évalué CLASSEIIA,65deg.C.doitre
utilisé avec ce systèeme d’évacuation -- ne pas mélanger l’apprêt
et le ciment d’un manufacturier avec le systême de ventillation
d’un autre manufacturier. Bien suivre les indications du
manufacturier lors de l’utilisation de l’apprêt et du ciment et ne
pas utiliser ceux--ci si la date d’expiration est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système
de ventilation est basé sur les instructions d’installation suivantes,
ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et
solin de toit utilisés avec ce système doivent être des matériaux
listés UL. L’acceptation du standard Canadien CSA B419 est
directement relié à l’installation conforme aux instructions ci--
haut mentionnées. Le standard Canadien recommande l’
inspection par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs
en bâtiments, département des incendies, etc) devraient être
consultées avant l’installation afin de déterminer si un permis est
requis.
(1) System 636 is a trademark of IPEX Inc.
Vista de pagina 0
1 2 3 4 5 6 ... 59 60

Indice de contenidos

Pagina 1 - Operating Instructions

-- 1 --340AAV4--WAY MULTIPOISE FIXED--CAPACITYCONDENSING GAS FURNACEInstallation, Start--up andOperating Instructionsfor Sizes 040--140, Series B &

Pagina 2 - IMPORTANT

-- 1 0 --PLUGCOLLECTOR BOXTUBE (GREEN)COLLECTOR BOXTUBE (PINK)COLLECTOR BOXDRAIN TUBE (BLUE& WHITE STRIPED)COLLECTOR BOXEXTENSIONDRAIN TUBECONDENS

Pagina 3 - SAFETY CONSIDERATIONS

-- 1 1 --NOTE: On 17-1/2-in. (445 mm) wide furnaces ONLY, cut tubebetween corrugated sections to prevent kinks from occurring.2. Inducer Housing Drain

Pagina 4 - Fig. 2 -- Dimensional Drawing

-- 1 2 --CONDENSATETRAPAUXILIARY "J" BOXPLUGCAPINDUCER HOUSINGDRAIN TUBE (VIOLET)COLLECTOR BOXDRAIN TUBE (BLUE)COLLECTOR BOX TUBE (PINK)RELO

Pagina 5 - 335122-201 REV. B LIT TOP

-- 1 3 --To relocate condensate trap from the blower shelf to desiredlocation, perform the following:1. Remove 3 tubes connected to condensate trap.2.

Pagina 6

-- 1 4 --COMBUSTION - AIRINTAKEVENTMANUALSHUTOFFGAS VALVESEDIMENTTRAPCONDENSATETRAPDRAINACCESS OPENINGFOR TRAP30″ (762 mm)MINWORK AREAA 12-IN. (305 mm

Pagina 7 - CODES AND STANDARDS

-- 1 5 --PLUGCOLLECTOR BOX DRAIN TUBE(BLUE AND WHITE STRIPED)INDUCER HOUSINGDRAIN TUBE (VIOLET)COLLECTOR BOXEXTENSION TUBECOLLECTOR BOX TUBE (GREEN)CA

Pagina 8 - INTRODUCTION

-- 1 6 -- UPFLOW OR DOWNFLOWHORIZONTALFRONT FRONTLEVEL (0”)TO 1/2” (13mm)MAXMIN 1/4” (7mm)TO 1/2” (13mm)MAXA02146Fig. 14 -- Furnace Location for Prope

Pagina 9 - APPLICATIONS

-- 1 7 --When a furnace is installed so that supply ducts carry aircirculated by the furnace to areas outside the space containing thefurnace, the ret

Pagina 10

-- 1 8 --Table 1 – Minimum Free Area Required for Each Combustion Air Opening or Duct to OutdoorsFURNACEINPUT(BTUH)TWO HORIZONT AL DUCTS(1 SQ. IN./2,0

Pagina 11

-- 1 9 --S Chlorine based swimming pool chemicalsS Water softening chemicalsS De-icing salts or chemicalsS Carbon tetrachlorideS Halogen type refriger

Pagina 12 - Applications

-- 2 --Required Notice for Massachusetts InstallationsIMPORTANTThe Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follow

Pagina 13

-- 2 0 --1 SQ IN . PER 4000 BTUH* DUCTS TO O UTDOORS 1 SQ IN. PER 4000 BTUH* C IRCULA TING AIR DUCTS VENT THR OUGH R OOF D B A C E 1 SQ IN. PER 4000 B

Pagina 14 - -- 1 4

-- 2 1 --Combination of Indoor and Outdoor Air1. Indoor openings shall comply with the IndoorCombustion Air Method below and,2. Outdoor openings shall

Pagina 15 - CONDENSATE TRAP TUBING

-- 2 2 --PLENUMOPENINGCAB DFLOOROPENINGA96283Fig. 21 -- Floor and Plenum Opening DimensionsDOWNFLOWSUBBASESHEET METALPLENUMFLOOROPENINGFURNACE(OR COIL

Pagina 16 - Step 1 -- General

-- 2 3 --Table 3 – Opening Dimension -- In. (mm)FURNACECASINGWIDTHAPPLICATIONPLENUM OPENING FLOOR OPENINGA B C D17-1/2(445)Upflow Applications 16 (406

Pagina 17 - Step 3 -- Hazardous Locations

-- 2 4 --NOTES:ANGLEIRON OREQUIVALENT(B)(A) ROD LOCATIONUSING DIMPLELOCATORS(SEE DIMENSIONALDWG FORLOCATIONS)13/16-IN. (21 mm) MAXALTERNATE SUPPORTLOC

Pagina 18 - VENTILATION

-- 2 5 --supply/outlet or air conditioning coil casing (when used), wheninstalled on non-combustible material. When installed oncombustible material,

Pagina 19 - -- 1 9

-- 2 6 --NOTE: Remove and discard bottom closure panel when bottominlet is used.Step 6 -- Bottom Closure PanelThese furnaces are shipped with bottom e

Pagina 20 - A&BC&DD&EF&G

-- 2 7 --level of gas controls. Place a ground joint union between gascontrol manifold and manual gas shutoff valve. (See Fig. 29.)UNIONSEDIMENTTRAPMA

Pagina 21

-- 2 8 --115-V FIELD-SUPPLIEDDISCONNECTAUXILIARYJ-BOX24-VTERMINALBLOCKTHREE-WIREHEATING-ONLYFIVE WIRENOTE 1NOTE 2FIELD-SUPPLIEDDISCONNECTCONDENSINGUNI

Pagina 22 - -- 2 2

-- 2 9 --FACTORYINSTALLEDLOCATIONALTE RN ATEFIELDLOCATIONA00212Fig. 32 -- Relocating J-BoxNOTE: Use AWG No. 18 color-coded copper thermostat wirefor l

Pagina 23 - Step 4 -- Air Ducts

-- 3 --TABLE OF CONTENTSSAFETY CONSIDERATIONS 3...DIMENSIONAL DRAWING 4...Clearances to Combustibles 5.

Pagina 24 - SUPPLY AIR CONNECTIONS

-- 3 0 --PCBTRANFRSNOTE #11LSPRS(WHEN USED)LGPSFUSED OR CIRCUIT BREAKERDISCONNECT SWITCH (WHEN REQ’D)NOTE #2JBL1L1BLWRTO 115VAC FIELD DISCONNECTNOTE

Pagina 25 - Step 5 -- Filter Arrangement

-- 3 1 --NON-DIRECT VENT/1-PIPE SYSTEM (SIZES040THROUGH 120 ONLY)In a non-direct vent (1-pipe) system, all air for combustion istaken from the area ad

Pagina 26 - Step 7 -- Gas Piping

-- 3 2 --BLWNUETRALSTATUS CODE LEDSEC-2 SEC-1EAC-2 L2FUSE 3-AMP0.5 AMP@24VACHUMTEST/TWIN G Com W Y R24V120 18090 150BL

Pagina 27 - -- 2 7

-- 3 3 --12 inches (30 cm) for applieances >10,000 Btuh(3 kW)and < 100,000 Btuh(30kW), 36 inches (91cm) for appliances > 100,000 Btuh(30kW) V

Pagina 28 - 24-V WIRING

-- 3 4 --A08601Table 9 – Other than Direct Vent Termination Clearance340AAV

Pagina 29 - Common Vent Systems

-- 3 5 --Table 10 – Maximum Allowable Exposed Vent Pipe Length -- Ft. (M) With and Without Insulationin Winter Design Temperature Ambient*FURNACE SIZE

Pagina 30 - -- 3 0

-- 3 6 --COMBUSTION-AIRCOMBUSTION-AIRAIRFLOWVENTVENTVENTAIRFLOWAIRFLOWAIRFLOWUPFLOW DOWNFLOWHORIZONTAL-LEFT DISCHARGE HORIZONTAL-RIGHT DISCHARGESelect

Pagina 31

-- 3 7 --5. Drill a 1/8-in. (3 mm) hole in 2-in. (51 mm) combustionair pipe using the hole in intake housing as a guide.6. Install a field-supplied No

Pagina 32 - -- 3 2

-- 3 8 --Table 11 – Maximum Allowable Pipe Length -- Ft (M)ALTITUDEFT (M)UNIT SIZE(BTUH)DIRECT VENT (2-PIPE) ONLYNON-DIRECTVENT (1-PIPE)ONLYNUMBER OF

Pagina 33 - -- 3 3

-- 3 9 --Table 11—Maximum Allowable Pipe Length -- Ft (M) (Continued)ALTITUDEFT (M)UNIT SIZE(BTUH)DIRECT VENT (2-PIPE) ONLYNON-DIRECTVENT (1-PIPE)ONLY

Pagina 34 - -- 3 4

-- 4 --A05053175⁄16"241⁄2"279⁄16"TYP275⁄8"2911⁄16"TYP3013⁄16"325⁄8"TYP331⁄4"TYPCONDENSATEDRAIN TRAPLOCATION(AL

Pagina 35 - COMBUSTION AIR PIPE

-- 4 0 --Table 11—Maximum Allowable Pipe Length -- Ft (M) (Continued)ALTITUDEFT (M)UNIT SIZE(BTUH)DIRECT VENT (2-PIPE) ONLYNON-DIRECTVENT (1-PIPE)ONLY

Pagina 36 - -- 3 6

-- 4 1 --Table 11—Maximum Allowable Pipe Length -- Ft (M) (Continued)ALTITUDEFT (M)UNIT SIZE(BTUH)DIRECT VENT (2-PIPE) ONLYNON-DIRECTVENT (1-PIPE)ONLY

Pagina 37 - -- 3 7

-- 4 2 --Table 11—Maximum Allowable Pipe Length -- Ft (M) (Continued)ALTITUDEFT (M)UNIT SIZE(BTUH)DIRECT VENT (2-PIPE) ONLYNON-DIRECTVENT (1-PIPE)ONLY

Pagina 38 - -- 3 8

-- 4 3 --FURNACEPIPE DIAMETERTRANSITION INVERTICAL SECTIONNOT INHORIZONTALSECTIONA93034Fig. 39 -- Combustion--Air and Vent Pipe DiameterTransition Loc

Pagina 39 - -- 3 9

-- 4 4 --HORIZONTAL TO ROOF HORIZONTAL TO SIDEWALLVERTICAL TO SIDEWALLVERTICAL TO ROOFVENT PIPEVENT PIPEVENT PIPEVENT PIPE12″ MIN12″ MIN12″ MIN12″ MIN

Pagina 40 - -- 4 0

-- 4 5 --At least 36 in.18 in. maximumVertical separationbetween combustionair and vent8 3/4 in. (222mm)for 3 in. (76mm)kit6 3/4 in. (172mm)for 2 in.

Pagina 41 - -- 4 1

-- 4 6 --Table 13 – Vent Termination Kit for Direct Vent/2-Pipe SystemDIRECT VENT (2 -PIPE) TERMINATION KIT TERMINATION SYSTEM DIAM. OF COMBUSTION AIR

Pagina 42 - -- 4 2

-- 4 7 --Roof terminations -- Locate assembly through roof toappropriate height as shown in Fig. 42.Sidewall terminations -- Locate assembly through s

Pagina 43 - (102 mm)

-- 4 8 --3. Use wire ties to secure heat tape in place. Wire ties can bepositioned in notches of condensate trap sides.4. Wrap field drain pipe with r

Pagina 44 - -- 4 4

-- 4 9 --HEATINGMODE(See Fig. 30 for thermostat connections.)The wall thermostat “calls for heat”, closing the R to Wcircuit. The furnace control perf

Pagina 45 - -- 4 5

-- 5 --335122-201 REV. B LIT TOPA08435Fig. 3 -- Clearances to CombustiblesFIRE, EXPLOSION, ELECTRICAL SHOCK ANDCARBON MONOXIDE POISONING HAZARDFailur

Pagina 46 - VENT TERMINATION

-- 5 0 --A99118Fig. 46 -- Inducer Housing Drain Tube CapA99119Fig. 47 -- Filling Condensate TrapNOTE: Record the status code BEFORE opening the blower

Pagina 47 - Step 11 -- Condensate Drain

-- 5 1 --d. Find installation altitude in Table 14 or 15.NOTE: For Canada altitudes of 2001 to 4500 ft, use U.S.A.altitudes of 2001 to 3000 ft (610 to

Pagina 48 - Step 3 -- Purge Gas Lines

-- 5 2 --Table 14 – Model 340AAV Orifice Size and Manifold Pressure for Correct InputFOR USE WITH A08606APercents of derate are based on midpoint of U

Pagina 49

-- 5 3 --Table 14 -- Model 340AAV Orifice Size and Manifold Pressure for Correct Input (Continued)FOR USE WITH A08606BPercents of derate are based on

Pagina 50 - Step 5 -- Adjustments

-- 5 4 --Table 15 – Model 340AAV Orifice Size and Manifold Pressure for Correct InputFOR USE WITH A08607APercents of derate are based on midpoint of U

Pagina 51 - -- 5 1

-- 5 5 --Table 15 -- Model 340AAV Orifice Size and Manifold Pressure for Correct Input (Continued)FOR USE WITH A08607BPercents of derate are based on

Pagina 52 - -- 5 2

-- 5 6 -- ½“NPT Inlet½” NPT Outlet 1/8” NPT Manifold Pressure Tap 1/8 NPT Inlet Pressure Tap Regulator Seal Cap Regulator Adjustment Under Cap ON/OFF

Pagina 53 - -- 5 3

-- 5 7 --BURNER FLAMEBURNERMANIFOLDA89020Fig. 50 -- Burner FlameR Y W G10 TURNSTHERMOSTAT SUBBASETERMINALS WITHTHERMOSTAT REMOVEDHOOK-AROUNDVOLT/AMME

Pagina 54 - -- 5 4

-- 5 8 --motor is disconnected, shut furnace down immediately.Determine reason pressure switch did not functionproperly and correct condition.5. Turn

Pagina 55 - -- 5 5

-- 5 9 --CHECKLIST -- DIRECT VENT (2-PIPE) INSTALLATIONLOAD CALCULATION________________ Heating Load (Btuh)________________ Cooling Load (Btuh)_______

Pagina 56 - SET TEMPERATURE RISE

-- 6 --These furnaces SHALL NOT be installed directly on carpeting,tile, or any other combustible material other than wood flooring.In downflow instal

Pagina 57 - MANIFOLD

-- 6 0 --Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligat

Pagina 58 - CHECKLIST

-- 7 --Installer Packet Includes:Installation, Startup, and Operating InstructionsService and Maintenance InstructionsUser’s Information ManualWarrant

Pagina 59

-- 8 --1/2 (13mm)INDUCER HOUSINGDRAIN CONNECTION1/4” (6mm)COLLECTOR BOX TOTRAP RELIEF PORT5/8 (16mm)COLLECTOR BOXDRAIN CONNECTION1/2 IN. (13mm) PVC OR

Pagina 60 - -- 6 0

-- 9 --COLLECTOR BOXTUBE (PINK)COLLECTOR BOXTUBE (GREEN)INDUCER HOUSING(MOLDED) DRAINTUBE (BEHINDCOLLECTOR BOXDRAIN TUBE)COLLECTOR BOXDRAIN TUBE (BLUE

Comentarios a estos manuales

Sin comentarios