Bryant Deluxe 4-Way Multipoise Variable-Capacity Direct-V Manual de usuario Pagina 1

Busca en linea o descarga Manual de usuario para Horno Bryant Deluxe 4-Way Multipoise Variable-Capacity Direct-V. Bryant Deluxe 4-Way Multipoise Variable-Capacity Direct-Vent Condensing Gas 355MAV User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
NOTE: Read the entire instruction manual before starting the
installation.
This symbol indicates a change since the last issue.
Index Page
DIMENSIONAL DRAWING........................................................3
SAFETY CONSIDERATIONS..................................................2-5
Clearances to Combustibles......................................................4
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS........5
INTRODUCTION..........................................................................5
APPLICATIONS ......................................................................5-12
General ......................................................................................5
Upflow Applications..............................................................5-8
Downflow Applications.........................................................8-9
Horizontal Left (Supply-Air Discharge) Applications .......9-11
Horizontal Right (Supply-Air Discharge) Applications...11-12
LOCATION ............................................................................13-14
General ....................................................................................13
Low-Heat Only Installation....................................................13
Furnace Location Relative to Cooling Equipment ................14
Hazardous Locations...............................................................14
INSTALLATION....................................................................14-16
Leveling Legs (If Desired).....................................................14
Installation In Upflow or Downflow Applications................14
Installation In Horizontal Applications.............................14-16
AIR DUCTS............................................................................16-19
General Requirements .......................................................16-17
Ductwork Acoustical Treatment.............................................17
Supply Air Connections..........................................................17
Return Air Connections..........................................................17
Filter Arrangement..................................................................17
Bottom Closure Panel........................................................17-18
Gas Piping..........................................................................18-19
ELECTRICAL CONNECTIONS...........................................19-21
115-v Wiring...........................................................................19
24-v Wiring.............................................................................20
Accessories ........................................................................20-21
DIRECT VENTING ...............................................................21-31
Removal of Existing Furnaces from
Common Vent Systems.....................................................21
Combustion-Air and Vent Piping .....................................21-29
Concentric Vent and Combustion-Air Termination
Kit Installation...................................................................29
Multiventing and Vent Terminations................................29-31
CONDENSATE DRAIN..............................................................31
General ....................................................................................31
Application..............................................................................31
Condensate Drain Protection..................................................31
SEQUENCE OF OPERATION..............................................31-36
Single-Stage Thermostat and Two-Stage Heating
(Adaptive Mode)................................................................33-34
Two-Stage Thermostat and Two-Stage Heating....................34
Cooling Mode....................................................................34-35
Thermidistat Mode..................................................................35
Super-Dehumidify Mode...................................................35-36
Continuous Blower Mode.......................................................36
Heat Pump...............................................................................36
Component Test......................................................................36
START-UP PROCEDURES ..................................................36-45
General ....................................................................................36
Select Setup Switch Positions...........................................36-39
Prime Condensate Trap With Water......................................39
Purge Gas Lines......................................................................39
Adjustments .......................................................................39-45
Set Gas Input Rate ............................................................39-42
Set Temperature Rise..............................................................42
Set Thermostat Heat Anticipator ......................................42-45
CHECK SAFETY CONTROLS ............................................45-46
A93040
ama
CERTIFIED
As an ENERGY STAR®
Partner, Bryant Heating &
Cooling Systems has de-
termined that this product
meets the ENERGY
STAR® guidelines for en-
ergy efficiency.
REGISTERED QUALITY SYSTEM
Fig. 1—Multipoise Orientations
A93041
UPFLOW
DOWNFLOW
HORIZONTAL
LEFT
AIRFLOW
AIRFLOW
AIRFLOW
AIRFLOW
HORIZONTAL
RIGHT
installation, start-up,
and operating instructions
DELUXE 4-WAY MULTIPOISE
VARIABLE-CAPACITY DIRECT-VENT
CONDENSING GAS FURNACE
Cancels: II 355M-40-9 II 355M-40-10
12-02
355MAV
Series H
—1—
Vista de pagina 0
1 2 3 4 5 6 ... 47 48

Indice de contenidos

Pagina 1 - Series H

NOTE: Read the entire instruction manual before starting theinstallation.This symbol → indicates a change since the last issue.Index PageDIMENSIONAL D

Pagina 2

a. Install drain tube coupling (factory-supplied in looseparts bag) into collector box drain tube (blue label)which was previously connected to conden

Pagina 3 - DIMENSIONS (IN.)

CAUTION: The condensate trap MUST be installedbelow furnace. See Fig. 6 for dimensions. The drainconnection to condensate trap must also be properlysl

Pagina 4 - INSTALLATION

d. Clamp tube to prevent any condensate leakage.2. Inducer Housing Drain Tubea. Remove factory-installed cap and clamp from LOWERinducer housing drain

Pagina 5

LOCATIONI. GENERALThis furnace must• be installed so the electrical components are protected fromwater.• not be installed directly on any combustible

Pagina 6

CAUTION: The furnace can operate in the high-heatmode when certain fault conditions occur. The followingprecautions should be taken:1. Size gas piping

Pagina 7 - 2 -IN. CPVC STREET

TABLE 1—OPENING DIMENSIONS (IN.)FURNACECASINGWIDTHAPPLICATIONPLENUM OPENING FLOOR OPENINGABCD17-1/2Upflow Applications 16 24-1/8 16-5/8 24-3/4Downflow

Pagina 8

be suspended from each corner by hanger bolts and angle ironsupports. (See Fig. 23.) Cut hanger bolts (4 each 3/8-in. all-threadrod) to desired length

Pagina 9

Secure ductwork with proper fasteners for type of ductwork used.Seal supply- and return-duct connections to furnace with codeapproved tape or duct sea

Pagina 10

To remove bottom closure panel, perform following:1. Tilt or raise furnace and remove 2 screws holding frontfiller panel. (See Fig. 26.)2. Rotate fron

Pagina 11 - pipe section is recommended

WARNING: Use proper length of pipe to avoid stress ongas control manifold. Failure to follow this warning couldresult in a gas leak resulting in fire,

Pagina 12

Check Primary Limit Control...45Check Pressure Switch...

Pagina 13

II. 24-V WIRINGMake field 24-v thermostat connections at 24-v terminal block onfurnace control. Y wire from thermostat MUST be connected toY/Y2 termin

Pagina 14

2. Humidifier (HUM)Connect an accessory 24 VAC, 0.5 amp maximum humidi-fier (if used) to the 1/4-in. male quick-connect HUMterminal and COM-24V screw

Pagina 15

→Fig. 31—Unit Wiring DiagramA02291LEGENDJUNCTIONTERMINALCONTROL TERMINALFACTORY POWER WIRING (115VAC)FACTORY CONTROL WIRING (24VAC)FIELD CONTROL WIRIN

Pagina 16

→ Fig. 32—Control CenterA02278FLASH UPGRADE CONNECTOR (FACTORY ONLY) ACRDJ – AIR CONDITIONING RELAY DISABLE JUMPERHUMIDIFIER TERMINAL (24-VAC 0.5 AMP

Pagina 17

Furnace combustion-air and vent pipe connections must be at-tached as shown in Fig. 34. Combustion-air intake plug fitting andinducer housing alternat

Pagina 18 - WASHABLE

NOTE: The minimum combustion-air and vent pipe length (each)for these furnaces is 5 ft. Short pipe lengths (5-8 ft) may dischargewater droplets. These

Pagina 19

TABLE 7—MAXIMUM ALLOWABLE PIPE LENGTH (FT)ALTITUDEUNITSIZETERMINATIONTYPEPIPE DIAMETER(IN.)*NUMBER OF 90° ELBOWS1234560 to 20000420402 Pipe or 2-In.Co

Pagina 20

TABLE 7—MAXIMUM ALLOWABLE PIPE LENGTH (FT) ContinuedALTITUDEUNITSIZETERMINATIONTYPEPIPE DIAMETER(IN.)*NUMBER OF 90° ELBOWS1234566001 to 7000‡0420402 P

Pagina 21

a. Determine location of combustion-air intake pipe con-nection to combustion-air intake housing as shown inFig. 34 for application.b. Reposition comb

Pagina 22 - →Fig. 31—Unit Wiring Diagram

12. Support combustion-air and vent piping a minimum ofevery 5 ft (3 ft for SDR-21 or -26 PVC) using perforatedmetal hanging strap.13. Slope combustio

Pagina 23 - → Fig. 32—Control Center

Fig. 2—Dimensional DrawingDIMENSIONS (IN.)UNIT SIZE A D E042040* 24-1/2* 22-7/8* 23*042060 17-1/2 15-7/8 16042080 21 19-3/8 19-1/2060080 21 19-3/8 19-

Pagina 24

Fig. 40—Sidewall Termination of 12 in. or MoreA87225MAINTAIN 12 IN.CLEARANCEABOVE HIGHESTANTICIPATED SNOWLEVEL OR GRADE,WHICHEVER ISGREATER.90°V

Pagina 25

furnaces are vented near each other, 2 vent terminations may beinstalled as shown in Fig. 42, 43, 44, 45, or 46, but next venttermination must be at l

Pagina 26 - See notes on next page

Fig. 45—Sidewall Termination of 12 in. or Less(Dimension "A" is Touching or 2-In.Maximum Separation)A96129ACOMBUSTION AIRCOMBUSTION AIRVEN

Pagina 27

thermostat is still calling for gas heating. The amber LED light willflash code 12 during the 90-second period, after which the LEDwill be ON continuo

Pagina 28

low-heat pressure switch LPS closes. When the high-heat pressureswitch closes, inducer motor RPM is noted by the furnace controlCPU before the 25-sec

Pagina 29

When the thermostat is satisfied, the R-to-G-and-Y circuitsare opened. The outdoor unit will stop, and furnace blowermotor BLWM will continue operatin

Pagina 30

c. Cooling off-delay-When the ″call for cooling″ is satis-fied and there is a demand for dehumidification, thecooling blower-off delay is decreased fr

Pagina 31

A00275→ Fig. 50—Two-Stage Furnace with Single-SpeedAir ConditionerFig. 51—Two-Stage Furnace with Two-SpeedAir ConditionerA00276A00277→ Fig. 52—Two-Sta

Pagina 32 - COMBUSTION AIR

To set the desired cooling airflow:1. Remove main furnace door and blower access door.2. Locate A/C setup switches on frunace control. (See Fig.32.)3.

Pagina 33 - (3 WRAPS MINIMUM)

C. Setup Switches (SW1)The furnace control has 8 setup switches that may be set to meetthe application requirements. Position these setup switches for

Pagina 34

These furnaces are shipped with the following materials to assist inproper furnace installation. These materials are shipped in the mainblower compart

Pagina 35

e. Find closest natural gas heat value and specific gravity inTable 11.f. Follow heat value and specific gravity lines to point ofintersection to find

Pagina 36

g. Jumper R and W/W1 and W2 thermostat connections onfurnace control. (See Fig. 32.) This keeps furnace lockedin high-heat operation.h. Turn high-heat

Pagina 37

EXAMPLE: (High-heat operation at 0—2000 ft altitude)Furnace input from rating plate is 100,000 BtuhBtu heating input = Btu/cu ft X cu ft/hrHeating val

Pagina 38 - See note 2

AVG. GAS SPECIFIC GRAVITY OF NATURAL GASHEAT VALUE 0.58 0.60 0.62 0.64AT ALTITUDE Orifice Mnfld Press Orifice Mnfld Press Orifice Mnfld Press Orifice

Pagina 39 - Notes for Fig. 50-57:

AVG. GAS SPECIFIC GRAVITY OF NATURAL GASHEAT VALUE 0.58 0.60 0.62 0.64AT ALTITUDE Orifice Mnfld Press Orifice Mnfld Press Orifice Mnfld Press Orifice

Pagina 40

Fig. 65 illustrates an easy method of obtaining thermostat ampdraw measurements. The amp reading should be taken after blowermotor has started and fur

Pagina 41

switch is closed. If either a status code 31 or 32 is flashedwhen inducer motor is disconnected, the furnace will shutitself down immediately. Determi

Pagina 42

CHECKLIST—INSTALLATIONLOAD CALCULATION____________ Heating Load (Btuh)____________ Cooling Load (Btuh)____________ Furnace Model SelectionCOMBUSTION A

Pagina 43

© 2002 Bryant Heating & Cooling Systems 7310 W. Morris St. Indianapolis, IN 46231—48—Printed in U.S.A. 355m4010 Catalog No. 5335-516

Pagina 44

Combustion-air pipe perforated disk assembly 1Condensate trap hole filler plug 3Vent and combustion-air intake hole filler plug 2CODES AND STANDARDSFo

Pagina 45

1. Collector Box Drain, Inducer Housing Drain, Relief Port,and Pressure Switch TubesThese tubes should be factory attached to condensate trapand press

Pagina 46

WARNING: Casing hole filler cap must be installed inblower shelf hole when condensate trap is relocated.Failure to follow this warning could result in

Pagina 47 - CHECKLIST—INSTALLATION

G. Upper Collector Box and Inducer Housing (Unused)Drain ConnectionsUPPER COLLECTOR BOX DRAIN CONNECTIONAttached to the UPPER collector box drain conn

Pagina 48

(2.) Condensate Trap Located on Right Side of Casing(a.) Install drain tube coupling (factory-supplied inloose parts bag) into collector box drain tub

Comentarios a estos manuales

Sin comentarios