37
Table 11 – Furnace Setup Switch Description
SETUP SWITCH NO. SWITCH NAME NORMAL POSITION DESCRIPTION OF USE
S W --- 1
Adaptive Heat
Mode
OFF
When off, allows 2-stage operation with a single-stage
thermostat.Turnonwhenusing2-stage thermostat to allow Low
Heat operation when R to W/W1 closes and High Heat operation
when R to W/W1 and W2 close.
S W --- 2
Blower OFF
delay
ON or OFF
Control blower OFF delay time. Used in conjunction with SW-3.
See Table 9B.
S W --- 3
Blower OFF
delay
ON or OFF
Control blower OFF delay time. Used in conjunction with SW-2.
See Table 9B.
COMBUSTION-
AIR
COMBUSTION-
AIR
AIR
FLOW
VENT
VENT
VENT
AIR
FLOW
AIR
FLOW
AIR
FLOW
UPFLOW DOWNFLOW
HORIZONTAL-LEFT DISCHARGE HORIZONTAL-RIGHT DISCHARGE
Select 1 vent pipe connection and
1 combustion-air pipe connection.
COMBUSTION-
AIR
COMBUSTION-
AIR
COMBUSTION-
AIR
COMBUSTION-
AIR
VENT
VENT
VENT
NOTE: Select 1 vent pipe connection and
1 combustion-air pipe connection.
NOTE:
* For Non-Direct Vent (1-Pipe) system, orient elbow so that its
opening faces down.
** For Non-Direct Vent (1-Pipe) system, orient elbow so that its
opening faces sideways.
† An external trap kit (see furnace product data sheet) must be used.
*
*
**
**
†
†
†
†
††††
† †
Bottom combustion-air not allowed for non-direct vent
A05092
Fig. 38 -- Combustion-Air and Vent Pipe Connections
Table 12 – Blower Off Delay Setup Switch (SW) 2-Stage Units
with PSC Blower Motors
DESIRED HEATING MODE
BLOWER-OFF DELAY (SEC)
SETUP SWITCH
S W --- 2 S W --- 3
90 OFF OFF
120 OFF ON
150 ON OFF
180 ON ON
FIELD-SUPPLIED
2-IN. (51 mm) DIA.
PVC PIPE
FIELD-SUPPLIED
2-IN. (51 mm) DIA.
PVC 90° ELBOW
COMBUSTION-AIR DISC
(FACTORY-SUPPLIED IN
LOOSE PARTS BAG)
A
A96211
Length of Straight Pipe Portion of
Combustion-Air Inlet Pipe Assembly -- In. (mm)
CASING WIDTH A
17---1/2 (445) 8 --- 1 / 2 ±1/2 (216 ± 13)
21(533) 10---1/2 ±1/2 (267 ± 13)
24---1/2 (622) 12 ±1/2 (318 ± 13)
Fig. 39 -- Combustion--Air Inlet Pipe Assembly
NOTE: (Direct Vent/2-pipe ONLY) vent pipe system has the
same diameter and same length as combustion air pipe mentioned
in section “Assembly of Combustion Air Pipe (Direct Vent/2-Pipe
system ONLY).”
NOTE: Do not count elbows or pipe sections in terminations or
within furnace (all elbows shown in Fig. 44 and Fig. 45 are not be
to counted).
2. Determine location of vent pipe connection to inducer
housing as shown in Fig. 38 for application.
3. Install vent pipe grommet (factory-supplied in loose parts
bag) into selected furnace casing vent pipe hole. (See
Fig. 44.)
4. Reposition elastomeric (rubber) inducer housing outlet cap
and clamp to appropriate unused inducer housing
connection. Tighten clamp.
UNIT DAMAGE HAZARD
Failure to follow this caution may result in unit component
damage.
Inducer housing outlet cap must be installed and fully seated
against inducer housing. Clamp must be tightened to prevent
any condensate leakage.
CAUTION
!
352AAV